Monday, April 17, 2017

"Installation of Insulation" at Restaurant Site, Gateway Hills

 

Gateway Hills Restaurant Update

April 10-April 14, 2017

We have made a lot of progress thus far on our Restaurant Site @GatewayHills.  Check out what we have completed this past week at +Gateway Hills Bar & Grill.
 

April 10th

Southwestern wall: Lower horizontal v-grooves cut, and vertical v-grooves cut on center between storefronts, base coat for finish applied to foam.

Southeastern wall: Vertical v-grooves cut between storefronts, base coat for finish applied to foam.

Installation of ipe siding around entrance.

Installation of ridgid foam insulation & laying out TPO membrane (seen above and below).

 

April 11th

 
Installation of ipe siding around entrance. 

April 12th


Installation of ipe siding around entrance.

Installation of ridgid foam inslullation & laying out TPO membrane (seen above and below).


Rough installation main gas pipe for RTU’s

Installation of glass into doors.

April 13th

 
Installation of ipe siding around entrance (seen above and below).



Installation of ridgid foam inslullation & laying out TPO membrane.
Installing drain crickets in center of roof in order to direct water into the center drains.

Rough installation main gas pipe for RTU’s

Installing finish coat of EIFS.
Northwest wall: EIFS installation will be completed after canopy is framed (seen above and below). 

Installation of gas meter on back-wall of building – meter locked until inspections.
 

April 14th

Installation of hole plugs for ipe siding. Installation of canopy stand-off blocking.

Installation of TPO membrane.

Installation of TPO membrane.

Installation of TPO membrane.

Installation of blocking, brackets, and main gas pipe and branch lines for RTU’s . The gas pipe will be extended to the spare RTU curbs, and capped, shut-off valves to be installed.  Main gas pipe stubbed outside and capped above meter.

 
 
 
We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!



Want to know more?
Visit:http://www.gateway-hills.com/new-restaurant-site/
Follow our progress blogs here:http://gatewayhills.blogspot.com/


Tuesday, April 11, 2017

"Flatley Challenge Helps Tech Companies to Grow in NH"





The John Flatley Company's Annual Flatley Challenge was recently featured in the Business NH Magazine for its efforts to help startup tech companies grow in New Hampshire. The Flatley Challenge is an annual competition for startup businesses and organizations. The winners of the competition each receive $10,000 in addition to free office space for a year at Gateway Hills. The Business NH Magazine's article "Flatley Challenge Helps Tech Companies to Grow in NH" details the winners and runners-up of the 2016 Flatley Challenge and each of their future business plans.


 

"I saw a need for startups in New Hampshire to be given a chance to succeed. One way to do this, from my perspective, was to provide promising companies free incubation space and a small monetary incentive" -John Flatley, quoted in Business NH Magazine.

 

XenoTherapeutics receives prize at the Flatley Awards Ceremony
XenoTherapeutics was highlighted on their achievement in winning the Flatley Challenge in the New Biotech Category, as well as its continued growth as a startup company in the science of xenotransplantation. XenoTherapeutics is looking forward to continued success in their clinical trials these upcoming months.

 

 

 
"XenoTherapeutics, which has seven employees and has been collaborating with Mass. General, will now have an office in Nashua." -Business NH Magazine

 

Datanomix receives prize at the Flatley Awards Ceremony 
The Hi-Tech Winners, Datanomix, were also featured on their stealth mode startup. Datanomix "focuses on solving major cloud infrastructure challenges for business" (Business NH Magazine, p.14). Additionally, "the founders have previously worked for DataGravity and EqualLogic, (the latter was acquired by Dell) that are also located in the Nashua Technology Park" (p.14). 

 

 

The 2017 winners join previous Flatley Challnege winners , Plexxi Inc., VGo Communications, Pilera Software, SMTP, Infinio, XCube and SimQuest Systems, most of which are still located in Gateway Hills. The hope is to replicate the success of Plexxi, the 2011 inaugural Flatley Challenge winner. Plexxi has grown from 10 employees in 8,474 square feet of space to more than 92 employees in 27,946 square feet in the Nashua Technology Park." - Business NH Magazine

 

Additionally, the Runners-Up Forcivity and Therapeutic Innovations are to join previous runners-up in the Flatley Challenge, such as AlignMeeting, Performology and AuthEntry, whom operate their businesses in The Flatley Innovation Center, a co-working incubation center at NTP @ Gateway Hills.

The John Flatley Company continues its efforts in supporting Startup Companies throughout the year, as they recently announced their Startup Pitch Nights @ Gateway Hills. The first Pitch Night is to be on May 16th. The Startup Pitch Night is an opportunity for startup companies to present their business ideas to a panel of judges for the chance to win free office space and cash prizes. Any startup company looking to pitch their ideas and plans should apply. Prizes for the winners are $1,000 for the Grand Prize winner, $500 for the Second Place, and $250 for the Third Place. All winners receive 3 months of free incubation space in our Nashua Technology Park, the ideal space from which to start your business.

Nashua Technology Park is home to numerous leading high-tech companies including Dell, Skillsoft, Amphenol TCS, Benchmark Electronics, Plexxi Inc, DataGravity, Infinio and more. The Flatley Challenge and Startup Pitch Nights give the opportunity to work alongside these leading tech companies as well as other startups, allowing for communication and connection with many levels of business. If you are interested in pitching your business at our Pitch Night, please fill the Formal Application Form. The application deadline is May 8, 2017.

 
 

We always look forward to welcoming new companies to our  Live, Work, Play, Shop Community @Gateway Hills, where smart business connects with healthy living. At Gateway Hills we value our role in helping startups grow, through our Flatley Challenge and Startup Pitch Nights.

To learn more about the Flatley Challenge visit: http://johnflatleyco.com/flatley-challenge/

To learn more about the Gateway Hills community visit: www.gateway-hills.com

               

Monday, April 10, 2017

"Facades & Siding" at Restaurant Site, Gateway Hills

Gateway Hills Restaurant Update

April 3-April 7, 2017

We have made a lot of progress thus far on our Restaurant Site @GatewayHills.  Check out what we have completed this week at +Gateway Hills Bar & Grill.

 
Three secondary roof drains will daylight in the rear of the building. Pipe will be cut back and final scupper will be installed at a later date.

Friday, March 31, 2017

"Windows, Siding & Electric Panels" at Restaurant Site, Gateway Hills

Restaurant Update March 27-31

A lot of work has been completed this week at our Restaurant Site +Gateway Hills Bar & Grill

Here’s an update on what was completed this week:

 
 
 
Installation of aluminum storefront frames.
 
Southeastern & Southwestern walls: Aluminum storefront frame installation complete.
 
Southwestern wall: Aluminum storefront frame installation complete.
 
Northwestern wall: Aluminum storefront frame installation complete.
 
Saw-cutting parking lot in preparation for gas pipe trenching.
 
Northeastern wall: Dark bronze aluminum cornice wrap installed at roof-line.
 
Northwestern and southwestern walls: Dark bronze aluminum cornice wrap installed at roof-line.
 
 
Wiring for exterior building lights x6 locations.
 
 

Wiring coiled above future location for electrical panel.
 
 
Doors frames installed at main entryway.
 
Glass installed into frames along northwestern wall.
 
Blocking for pipe hangers installed across truss bay along top truss chords. Pipe installed in hangers.
 
Installation of glass in all frames, with the exception of doors.
 
Installation of stand-off blocking for steel canopies.
 
Wires installed for future power to patio canopy.
 
 Installation of rough electric and control wiring for RTU’s.
 
 One of three secondary roof drains that daylight in the rear of the building. Pipe will be cut back and final scupper will be installed at a later date.

 

Installation of ipe wood siding. Blocking out roof drains & RTU curbs.
 
 Blocking installed around primary and secondary drains, and blocking leveled and installed under RTU curbs. 

We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!



Want to know more?
Visit:http://www.gateway-hills.com/new-restaurant-site/
Follow our progress blogs here:http://gatewayhills.blogspot.com/