Monday, May 15, 2017

“Backfilling & Installing” at Restaurant Site, Gateway Hills

Gateway Hills Restaurant Update

May 8-May 12, 2017

Restaurant Progress underway @ Gateway Hills. See last week's update at +Gateway Hills Bar & Grill.

May 8, 2017

Prepping front sidewalk.

Backfilling patio retaining wall (seen above and below).

 
 

Shutoff valves installed and capped for future RTU’s.

Gas piping installed through roof to RTU’s  (seen above and below).

 
 
May 9, 2017

Backfilling & grading patio retaining wall.

Installing insulation & plywood in preparation for panel installation.
 
 
May 10-12, 2017

Detention basin work.

Installing erosion control blankets, erosion stones, loam, and sand.

Installing insulation & plywood in preparation for panel installation, Wiring RTU’s, Installation of panel box, and Final wiring & trip plates installed on site lighting (seen above and below).

 

EIFS work completed on Northwest wall. Installing foam, rasping, installing base coat, followed by finish coat.

Installing new transformer on to concrete pad.
 
 
We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?
Visit:http://www.gateway-hills.com/new-restaurant-site/
Follow our progress blogs here:http://gatewayhills.blogspot.com/
Like us on Facebook: Gateway Hills
Follow us on Twitter: @GatewayHills
Follow us on LinkedIn: The John Flatley Company
Like us on Instagram: Gateway Hills
Follow us on Pinterest: GatewayHills

Thursday, May 11, 2017

12 Ways to Celebrate Mom this Weekend @Gateway Hills

Treat Mom to something special this weekend! Gateway Hills has everything you need to plan a relaxing and rejuvenating weekend.











 
 
 
 
Go on a scenic walk on our 2 Mile Trail Network
 
 
 
 
Treat Mom to a lunch at Pressed Café @Tara Commons
 
 
 
Followed by dessert at Orange Leaf right next door @Tara Commons
 
 
 
 
Bring Mom to the Collective Arts Launch & Tasting at Craft Beer Cellar @Tara Commons this Friday, 4-6pm
 
 
 

Attend a yoga class at the Gateway Hills Health Club
 
 

 
Surprise Mom by registering for all 4 concerts in the Gateway Hills Summer Concert Series
 
 
 
 
Gift a getaway at the Homewood Suites Hotel @ Gateway Hills
 
 

 
Make plans to run the 2 Mile Trail Race together
 
 
 
 
 
Gift Mom with memberships to PureBarre and Orange Theory @Tara Commons
 


 
Have a gardening day with Mom in your newly reserved Garden Plot @ The Garden Center
 
 
 
 
End your day with a family cookout at our grill stations @ Gateway Hills
 

A great way to say, “Thanks Mom”.

Tuesday, May 9, 2017

"Primaries & Secondaries" at Restaurant Site, Gateway Hills

Gateway Hills Restaurant Update

May 1-May 5, 2017

Last week’s progress on the Restaurant Site @ Gateway Hills. See what was done last week at +Gateway Hills Bar & Grill.


May 1, 2017
Backfilling primary utility trenches.


Backfilling primary utility trenches.


Backfilling secondary utility trenches.


Excavation for primary roof drains.


Excavation for primary roof drains.

Excavation for secondary power inside of building.


Grounding wires installed in preparation for transformer pad.


Conduits installed into building from transformer.


New poles are on the right side.


Building forms for retaining wall footings, installation of rebar for footings and peirs.


Setting grade pitch of pipe alongside Hiltz.

May 2, 2017

Backfilling of primary & secondary trenches.


Installing grade stakes for front walkway.


Strip forms from footings. Building forms for retaining wall, installing rebar & foundation ties.


Installing primary roof drain pipe.


Installing primary roof drain pipe.

May 3- May 4, 2017

Excess fill cleanup. Gravel & fabric installed up to top of footing. Final grade & compact of primary & secondary trenches.


Strip forms from walls.


Strip forms from walls.


Installing conduit & sweeps to pole.


Installing pull box for secondaries outside of building. Connecting conduits through foundation wall.  


Setting transformer pad.

May 5, 2017

Backfilling of interior trenches.

Backfilling of interior trenches.



We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?
Visit:http://www.gateway-hills.com/new-restaurant-site/

Follow our progress blogs here:http://gatewayhills.blogspot.com/
Like us on Facebook: Gateway Hills
Follow us on Twitter: @GatewayHills
Follow us on LinkedIn: The John Flatley Company
Like us on Instagram: Gateway Hills
Follow us on Pinterest: GatewayHills