May 30-June 2, 2017
Restaurant Progress underway @ Gateway Hills. See last week's updates at +Gateway Hills Bar & Grill.May 30th
- Installing pressure treated rails for guardrail
- Hydroseeding remaining areas along Innovative Way
- Installing pressure treated rails for guardrail around patio
- Installing gate posts for emergency exit (gates to be fabricated and installed next week)
- Installing dumpster enclosure (gates to be fabricated and installed next week)
- Installing break metal along top of parapet
- Wiring electric meter
June 1st- June 2nd
- Installing galvanized steel canopies at front of restaurant.
- Installing water meter, pressure reducing valve, and backflow preventer
We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?
Follow our progress blogs here:http://gatewayhills.blogspot.com/
Like us on Facebook: Gateway Hills
Follow us on Twitter: @GatewayHills
Follow us on LinkedIn: The John Flatley Company
Like us on Instagram: Gateway Hills
Follow us on Pinterest: GatewayHills
No comments:
Post a Comment