Tuesday, June 6, 2017

"Installing & Hydroseeding" at Restaurant Site, Gateway Hills

Gateway Hills Restaurant Update

May 30-June 2, 2017

Restaurant Progress underway @ Gateway Hills. See last week's updates at +Gateway Hills Bar & Grill.


May 30th
  •  Installing pressure treated rails for guardrail

  •  Hydroseeding remaining areas along Innovative Way


 
 May 31st
  • Installing pressure treated rails for guardrail around patio
  • Installing gate posts for emergency exit (gates to be fabricated and installed next week) 
  • Installing dumpster enclosure (gates to be fabricated and installed next week)


  • Installing break metal along top of parapet

  • Wiring electric meter

June 1st- June 2nd
  • Installing galvanized steel canopies at front of restaurant.

  • Installing water meter, pressure reducing valve, and backflow preventer 



We are still looking for a restaurant operator for this 7,500 SF restaurant space for lease. If you know someone looking to open in a new location, call us today: 603-598-7500!Want to know more?
Follow our progress blogs here:http://gatewayhills.blogspot.com/

Like us on Facebook: Gateway Hills
Follow us on Twitter: @GatewayHills
Follow us on LinkedIn: The John Flatley Company
Like us on Instagram: Gateway Hills
Follow us on Pinterest: GatewayHills

No comments:

Post a Comment